Khajuwala – Poogal – Bap section

Preparation of Feasibility Study/Detailed Project Report of Selected Road Stretches/Corridors for up gradation to two/four lane NH Configuration under Bharatmala Project.

Salient Features :

Length of road – 211 km
Minor Bridge – 1 Nos.
Flyover – 4 Nos.
Culverts – 150 Nos.
Toll plaza – 3 Nos.

Services provided :

Survey & investigations
Detail design of Highway and structures
Design of toll plaza and way side amenities
Preparation of BOQ and cost estimate
Preparation of Tender documents

TEAM ASSIGNED :

N.B. Shah – Team Leader
Apurva Parikh – Traffic Engineer
Varshil Parikh – Sr. Highway Engineer
Dhrumil Parikh – Sr. Bridge Engineer
Darshit Shah – Highway design Engineer
Nisarg Shah – Bridge design Engineer
Vaibhav Doshi – Bridge design Engineer

2-Laning of Khajuwala – Poogal – Bap section of Bharatmal (NH-911)
Client Name

National Highways Authority of India

Estimated Cost

Rs. 875 Cr.